Breadcrumb Navigation

Addition at Arlington High School
Posted in , on July 19, 2024

Photos give glimpse of huge addition

The addition at Arlington High School looks big when you drive by. But wait until you see the inside. It鈥檚 huge.

You can鈥檛 walk in yet 鈥 there are several more months of construction left 鈥 but you can see some photos taken earlier this week. Check them out .

New library under construction at Arlington High School

New library at Arlington High

The addition 鈥 dubbed the 鈥淐ube鈥 by AHS principal Stacie Humbles 鈥 is the biggest part of the 2019 Bond-funded construction project at the school. It will house new classrooms, a new open-concept library, a new band hall, a new orchestra room, art rooms, gallery space, a black box theater and more. It will also provide accessible passage between the school鈥檚 two existing gyms.

While the addition is the most noticeable part of the construction project, there鈥檚 a lot more that has been done, including renovations for the existing building鈥檚 mechanical, electrical and plumbing systems. Outside, the athletic field was replaced with new turf and the track was resurfaced, the tennis courts were resurfaced and the softball team got a new competition field.

New cheer and drill room - former wrestling room at Arlington High

New cheer and drill room at Arlington High

In the existing building, new flooring and ceilings have been installed in Halls A and B, and they are wrapping up renovations in C Hall right now. The culinary room is also currently getting renovated, and the former wrestling room is getting converted into a cheer and drill room, complete with renovated locker rooms and restrooms. Wrestling moved to an updated building near the field house.

Most of the renovations in the existing building will be done next month in time for students to return to school. Construction on the addition should wrap up by the end of the calendar year, and then the 鈥淐ube鈥 is scheduled to open in January 2025.

Learn more about all Bond 2019 projects here.