Breadcrumb Navigation

Arlington High School 1920

Arlington High School
818 W. Park Row, Arlington, TX 76013

Status

Design and construction update
聽 聽 聽

Scope

Scope of work planned
for the campus
聽 聽

DETAILS

Phase, schedule,
architect and
construction manager

Questions

Questions about AHS? Contact us.
聽 聽聽

Project Status

鲍笔顿础罢贰:听Construction on the addition is ongoing and is expected to wrap up by the end of the year. It should open for students when school starts in January after the winter break.

For the existing building, portions of roof replacement are done, boilers have been replaced and a new switchgear has been installed.聽New flooring has been installed in Halls A, B and C along with new ceilings and lighting. The new flooring matches what is being installed in the addition.

The football field and track have been replaced, and the tennis courts were resurfaced. Work on the new competition softball field is almost finished and is open.聽

The whole project at Arlington High School includes an addition with new classrooms, a new library, a new band hall and more, and it will help provide the space needed for the fine arts/dual language high school academy.

See the schematic design presentation given by VLK Architects to the 极速六合彩 Board of Trustees on March 10, 2022.

Project Scope

  • Heating & A/C, Electrical, Plumbing Improvements
  • Interior Renovations (Paint, flooring, ceilings, lighting, windows, etc.)
  • ADA Accessibility Improvements (Door hardware, elevators, ramps, restrooms, etc.)
  • Restroom Renovations
  • Site Improvements (Lighting, landscaping, drainage, irrigation, signage, etc.)
  • Roof Renovations
  • Paving Improvements
  • Auditorium Finish Renovations

This list is not comprehensive and is subject to change.

  • Fine Arts Renovations
  • Instruments & Uniforms
  • Visual Arts
  • Career Tech Upgrades
  • Special Education Upgrades
  • Softball Field Improvements (Upgrade to competition level)
  • Athletic Facility Improvements (Field turf and track replacements, gymnasiums, lockers, tennis, etc.)

This list is not comprehensive and is subject to change.

  • Expanded Security Camera Coverage and Upgraded Camera Software
  • Safety & Security Enhancements (Exterior and interior key system upgrades, district communication system upgrades, lighting, fencing, etc.)
  • Device Upgrades, Student Calculators, Expanded Access

This list is not comprehensive and is subject to change.

Project Details

PHASE
Phase 2

CONSTRUCTION
Start: Fall 2022聽 聽 聽 Finish: Fall 2024

ARCHITECT
VLK

CONSTRUCTION MANAGER
Joeris

Contact Us

Bond 2019 logo
极速六合彩 Bond 2019 logo

Bond 2019

$966 MILLION

鈥 Facilities
鈥 Fine Arts
鈥 Safety, Security & Technology
鈥 Transportation

Fine Arts icon
Fine Arts icon

Fine Arts

The fine arts portion includes: theater equipment and black boxes, instruments, visual arts equipment and work surfaces, piano replacements and uniforms for marching bands, drill teams and choirs.

Icon for safety, security and technology
Icon for the Bond 2019's Safety, Security & Technology

Safety, Security & Tech

The safety, security and technology portion includes: additional security cameras and upgraded alarm systems, districtwide communications system upgrade, network infrastructure, device replacements and strategic 1:1 (student devices).

Transportation icon
Transportation icon

Transportation

The transportation portion of the bond includes new buses, shuttle buses, service vehicles. Also included are new vehicles and trailers for the Dan Dipert Career + Technical Center, the Agricultural Science Center, high school bands and security.

Facilities icon
Facilities icon

Facilities

The facilities portion includes: new construction, condition needs and life cycle improvements for all schools, new playgrounds at all elementary schools and facility upgrades for fine arts and athletics.