Information and Links:

Address:



STEM, STRINGS & VESTIBULE
Phase: Two

´¡°ù³¦³ó¾±³Ù±ð³¦³Ù:ÌýHahnfeld Hoffer Standford

Construction Manager: W.B. Kibler

Start Construction: Summer 2017
Finish: °Â¾±²Ô³Ù±ð°ùÌý2017



LIFECYCLE & DEFICIENCY
Phase: Five

Architect: LBL Architects

Construction Manager: Big Sky Construction

Start Construction: Fall 2019*
Finish: Spring 2019*
*Dates are projections and subject to change.


 

Project Status: Substantially Complete

Stage one - renovations to create two STEM labs and a strings room - is complete. The art room was also renovated and a computer lab converted into a regular classroom.

Stage two - with life-cycle and deficiency upgrades - began at the end of the 2018-2019 school year and should wrap up over the winter break. The scope included roof work, putting in a new parallel drive, installing new water fountains and installing new HVAC controls and new roof-top HVAC units. All that remains is landscaping and replacing a switchgear. The switchgear will replaced over the winter break.


Project Scope

Bond-funded work at Ditto is being done in two stages. The first stage includes adding two STEM labs, an art room and a strings room. The second stage includes a number of life-cycle and deficiency upgrades.

  • Add two STEM labs
  • Add a strings classroom
  • Upgrade technology connectivity
  • Improve existing site accessibility
  • Add additional card access controls
  • Repair roof
  • Replace and add parking
  • Repair/replace and upgrade heating and A/C, electrical, electrical equipment, plumbing, exterior, landscaping and site lighting
  • Upgrade security cameras and PA system (to be done by ¼«ËÙÁùºÏ²Ê security and technology departments)

This report includes highlights of projects. The list is not comprehensive and is subject to modification.