Information and Links:
Address:
STEM, STRINGS & VESTIBULE
Phase: Two
´¡°ù³¦³ó¾±³Ù±ð³¦³Ù:ÌýHahnfeld Hoffer Standford
Construction Manager: W.B. Kibler
Start Construction:Â Summer 2017
Finish: °Â¾±²Ô³Ù±ð°ùÌý2017
LIFECYCLE & DEFICIENCY
Phase: Five
Architect: LBL Architects
Construction Manager: Big Sky Construction
Start Construction:Â Fall 2019*
Finish: Spring 2019*
*Dates are projections and subject to change.
Project Status: Substantially Complete
Stage one - renovations to create two STEM labs and a strings room - is complete. The art room was also renovated and a computer lab converted into a regular classroom.
Stage two - with life-cycle and deficiency upgrades - began at the end of the 2018-2019 school year and should wrap up over the winter break. The scope included roof work, putting in a new parallel drive, installing new water fountains and installing new HVAC controls and new roof-top HVAC units. All that remains is landscaping and replacing a switchgear. The switchgear will replaced over the winter break.
Project Scope
Bond-funded work at Ditto is being done in two stages. The first stage includes adding two STEM labs, an art room and a strings room. The second stage includes a number of life-cycle and deficiency upgrades.
- Add two STEM labs
- Add a strings classroom
- Upgrade technology connectivity
- Improve existing site accessibility
- Add additional card access controls
- Repair roof
- Replace and add parking
- Repair/replace and upgrade heating and A/C, electrical, electrical equipment, plumbing, exterior, landscaping and site lighting
- Upgrade security cameras and PA system (to be done by ¼«ËÙÁùºÏ²Ê security and technology departments)
This report includes highlights of projects. The list is not comprehensive and is subject to modification.