Bid date for bond work at Crouch, Knox and Thornton Elementaries extended to Feb. 16

Knox Elementary

Feb. 1, 2016 - The Board of Education of 极速六合彩 will receive sealed proposals for bond-funded renovations at Crouch, Knox and Thornton Elementaries () until Feb. 16, 2017.

About the project
The package includes adding a security vestibule, strings room and two STEM labs at each elementary, along with life-cycle and deficiency upgrades.

Bids
Bids are due Thursday, Feb. 16, 2017, by 2 p.m., and should be delivered to the 极速六合彩 Purchasing Office at the Administration Building located at 1203 W. Pioneer Parkway, Arlington, TX 76013. All bids received after this time will not be accepted. Be sure to see the聽 for full instructions.

Bid documents may be obtained on the .

Pre-proposal conference
A pre-proposal conference will be held on Thursday, Feb. 2, 2017, at 10:00 a.m. at Knox Elementary, Room 508. Visitors must check in at the Main Office before proceeding. The meeting will conclude with a visit to each campus.

The Project Sites are located at:
- Crouch Elementary School: 2810 Prairie Hill, Grand Prairie, Texas 75051
- Knox Elementary School: 2315 Stonegate, Arlington, Texas 76010
- Thornton Elementary School: 2301 E. Park Row Dr., Arlington, Texas 76010

Questions
For questions, please email tcraig1@aisd.net. Please see CSP specifications for dates and information.